£110,000
Project Features 3+1
Joinery: PVC Double Glazing
Glass Balustrades on Balconies
Hydrophore and Expansion Tank
Stairs made of Natural Marble
2-Ton Water Tank on the Ground
Elevator
Roof Waterproofing
Shower Cabin
Wardrobes in Rooms
Heating: Boiler
Flooring: Granite Ceramic, Ceramic / Parquet Application
TV, Satellite, Camera, Air Conditioning Infrastructure
Interior Doors with Lacquer Paint
Open and Closed Parking Spaces on the Ground